
Fig.
Production halls
Two halls — cutting, sewing and finishing; decoration.
The factory
12,000 m² in the 1st Industrial Zone, 6th of October City. One hall for cutting, sewing and finishing; one for decoration. 1,500 people. Average age 30.

Fig.
Two halls — cutting, sewing and finishing; decoration.

Fig.
Automatic cutting, computerised markers, five laser cutters.

Fig.
Seven multi-head machines. Flat, 3D puff, appliqué.

Fig.
Three screen-printing carousels. Plastisol and water-based.

Fig.
Two printers and a calender. 5,000–6,500 pcs/day.

Fig.
Twelve balanced lines. 505 industrial machines.

Fig.
Colour assessment, 4-point inspection, end-of-line audit.

Fig.
Made in Egypt. Packed to the buyer’s manual.

Under one roof
Cutting, decoration, assembly, quality control and packing all happen inside our own facility, on our own equipment, with our own staff. That is what lets us control the cost, the timing and the standard of every order we accept — and it is why there is one accountable party when something needs to be corrected.
Sewing room
Principal makes: Juki · Pegasus · Kansai Special · Cole · Jack
181
4-thread overlock
142
Single needle lockstitch
35
Cylinder coverstitch
18
Baby cylinder
17
Flatseam
14
Flat bed coverstitch
14
Overlock (Cole)
13
Double needle lockstitch
12
Feed-off-arm
10
Binding machine
Next programme
Factory visits and third-party inspections are welcome at any stage.